General-tools-and-instruments RGR122 Instrukcja Użytkownika Strona 3

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 7
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 2
3
GB
P. ANTENNA
- Transmits radio signal to main unit
Q. CROSS
- Checks the leveling of the rain collector
R. BATTERY COMPARTMENT
- Accommodates two UM-3 or AA-sized batteries
INSTALLATION
1. Position the main unit and rain collector within effective
range (300 feet).
2. a) Insert batteries into the rain collector.
b) Mount the rain collector on a level surface
c) Put drops of water on the cross at the base to check the
leveling
d) Use the metal ring to adjust the leveling of the rain collector
4
3
TOP VIEW
!
"
Water stay at
position 1 - 4
means the gauge
is not leveled
"AA" UM3 1.5V
"AA" UM3 1.5 V
METAL RING
Przeglądanie stron 2
1 2 3 4 5 6 7

Komentarze do niniejszej Instrukcji

Brak uwag